1WARNING:IF THE INFORMATION IN THESE INSTRUC-TIONS ARE NOT FOLLOWED EXACTLY, A FIREOR EXPLOSION MAY RESULT CAUSING PROP-ERTY DAMAGE, PERSONAL INJURY O
10HORIZONTAL RUN35 Ft.(10.67 m)30 Ft.(9.14 m)25 Ft.(7.62 m)20 Ft.(6.10 m)15 Ft.(4.57 m)5 Ft.(1.52 m)10 Ft.(3.05 m)5 Ft.(1.52 m)VERTICAL RUN15 Ft.(4.57
11HORIZONTAL RUN35 Ft.(10.67 m)30 Ft.(9.14 m)25 Ft.(7.62 m)20 Ft.(6.10 m)15 Ft.(4.57 m)5 Ft.(1.52 m) Min. Rise2 Ft.(.60 m)10 Ft.(3.05 m)5 Ft.(1.52 m)V
12Co-linear Vent InstallationThe GF 300 DV may be vented through a masonry orClass A prefabricated chimney using a Co-linear FlexibleVent system appro
13Masonry or Prefabricated ChimneyConversionThe GF 300 DV is approved for use with Simpson Dura-vent Chimney Kit #934 in a masonry chimney or aprefabr
14Horizontal Termination Any horizontal termination must fall within theshaded portion of the vent window graph illustratedin figs. 9 or 11. For Sno
15Figure 20. Vent Terminal Clearances - National Fuel Gas Code.Horizontal Termination ClearanceA = Clearance above grade, veranda, porch , deck, or b
16CloseOpenFigure 22. Locate and remove the Air Shutter wingnutfrom under the right side of the stove.Tools required:• 1/2” open ended wrench or deep
17Fuel Conversion Procedure1. Turn off gas supply to stove.2. Remove the stove Top Plate.3. Disengage the two Glass Frame Latches at the top ofthe fir
18Gas Supply ConnectionThe gas supply line connection is made to the valve justinside the left rear leg. The gas supply line should be 3/8"npt wi
19Gas PressureCorrect gas pressure is essential for efficient and safeoperation of the GF 300 DV gas stove. It is importantthat the correct pressure
2Welcome to Jøtul...Congratulations on the purchase of your newJøtul GF 300 DV Allagash Gas Heater.We at Jøtul are glad you’ve made the decision towar
20CloseOpenOptional Wall Thermostat orRemote ControlUse only a 750 millivolt DC two-wire circuit thermostatwith this appliance. The thermostat should
21Log Set InstallationBrick Kit Note: Install the optional Antique Brick Kit155370 before installing the logset. See page 27 andthe instructions pro
22System Check1. PURGING THE GAS LINE: When lighting the appli-ance for the first time, it will take a few moments toclear the gas line of air. Once
23OperationFamiliarize yourself with the controls of the GF 300 DV.Make sure that anyone else using the appliance is alsofamiliar with the controls an
24Glass CareClean the glass only when necessary. Wipe the surfacewith a clean, dampened, soft cloth. Follow with a dry,soft towel. Take care not to sc
25Optional Blower # 155371Figure 42 . Blower Kit ComponentsFigure 43 . Attach Snapstat and Blower Brackets. THIS BLOWER MUST BEELECTRICALLY GROUN
26Blower OperationThe optional variable-speed blower will enhance heatcirculation around the firebox and out into the room.The blower is controlled by
27Figure 47. Brick Kit ContentsOptional Antique Brick Kit# 155370Figure 48.Disengage thecompression latchesto remove the glassframe.Figure 50. Insta
2848 5933 3146 32 43 47424741402545739 27262926430355444950511413121145109618524717475719181647584715472047584757 4756 4721475447155362606163476467676
298. Side Clip... 1284019. Simpson DuraVent Collar ... 12912610. Colla
3Table of ContentsService Tools ... 3Specifications ... 4General In
30MODEL NAME: ________________________SERIAL NUMBER: ______________________DATE OF PURCHASE: ___________________PURCHASED FROM: ____________________NA
313. Access the lower controls.4. Depress gas control knob slightly and turn clock-wise to “OFF”. Do not force.FOR YOUR SAFETY, READ BEF
32This appliance must be installed in conformance with local and national building regulations. It is important that thethese instructions be carefull
4SpecificationsGF 300 DV SpecificationsInput RatesNatural Gas26,000 BTU/hr. maximum input 14,000 BTU/hr. minimum inputPropane 26,000 BTU/hr. maximum
5Hardware Bag Contents• Fuel Conversion Kit - LP... 155372• Ember Bag , 4 oz. ...
6LocationIn selecting a location for the stove, consider thefollowing points:1) Heat distribution2) Vent termination requirements3) Gas supply line
7Alcove InstallationMaximum Alcove Depth: 24” (610 mm)Minimum Alcove Width: 36 3/4” (934 mm)Minimum Ceiling Height: 61” (1549 mm) With Short
8SEALANTVent RestrictionThe GF 300 DV is equipped with an Exhaust RestrictorPlate which enables you to regulate the flow of exhaustgas. The plate prev
9Vertical Vent TerminationThe Jøtul GF 300 DV can be vertically vented through aceiling or to a roof termination with the followingguidelines: The te
Comments to this Manuals